• Français
  • English

ALBERT 1ST TOWER


Location : Rueil-Malmaison
Architect : B. ARCHITECTURE / CABINET D'ARCHITECTURE LESNÉ - BERNADAC
Project management : Cancava / Freo France / Monsieur Revert
Partner : ISO STAF
Surface : 16120 m2

Thanks to our products and solutions dedicated to Passive Fire Protection, Geostaff has been selected to participate in the construction of the Albert I Tower.

Many reference sites in France and abroad are now realized with Geostaff fire-stop plates for the installation of smoke extraction and ventilation ducts and for the fire protection of electrical cable trays or gas pipes.

All our fire protection systems and solutions are tested and classified according to the strictest European standards for passive fire protection. They are certified and CE marked.

Other references

Scroll to Top