Fire rated ductworks
The fire rated ductworks, classified according to the EN 13501-2 standard, allow the protection of gas pipes, medical fluids, various pipelines or electrical cable trays up to a fire exposure time of 3 hours: EI 180S.
They can be manufactured as desired:
-
-
- By means of GEOTEC®S boards in the same way as for GEOTEC® fire rated ducts.
- By means of GEOFLAM®F boards in the same way as for GEOFLAM® ventilation and smoke extraction ducts.
- By means of GEOFLAM® C – Light channels for cross-sections up to 350 x 200 mm.
-









System advantages
- Assembly by screwing, stapling and “polochonnage” possible (mixture of sisal fiber, plaster and glue)
- Lightweight materials
- 100% natural gypsum-based products
- CE certified
- Ease of installation
- Time saving
- Compatible with Rft products
System performances
Horizontal or Vertical rated ductworks
Tests in accordance with EN 1366-5 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied | Tests in accordance with EN 1366-5 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied |
---|---|---|---|---|---|---|---|
Fire protection of horizontal and vertical service ducts and shafts | GEOTEC® S or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n°EFR-16-003067 Rév.1 | 50x50 to 2500x1500 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Glue & Screw system |
Fire protection of horizontal and vertical service ducts and shafts | GEOTEC® S or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n°EFR-16-003069 Rév.1 | 50x50 to 2500x2000 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Polochonnage (mixture of sisal fiber and glue) |
Fire protection of horizontal and vertical service ducts and shafts | GEOFLAM® F-Light | 35 | EI 120S | PV n° EFR-14-001050 Rév.1 | 50x50 to 1250x1000 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Polochonnage (mixture of sisal fiber and glue) |
Fire protection of horizontal and vertical service ducts and shafts | GEOFLAM® FX | 50 | EI 180S | PV n° EFR-12-A-698 Rév.2 | 50x50 to 2500x2000 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Polochonnage (mixture of sisal fiber and glue) |
Fire protection of horizontal and vertical service ducts and shafts | GEOFLAM® C-Light channels | 35 | EI 120S | PV n° EFR-14-001050 Rév.1 | 50x50 to 350x200 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Glue |