GEOTEC® Smoke extraction and ventilation ducts
Smoke extraction and ventilation solutions
In the case of a fire in a building, fire, smoke, and heat are confined to the interior of the premises. The construction of a smoke and ventilation system is a crucial step in the control of a fire. This consists of sweeping the space to be cleared of smoke by a flow of air. This means an evacuation of smoke on one side (smoke extraction duct or high ventilation) and a supply of fresh air on the other (ventilation duct or low ventilation) allowing the rescue services to evacuate people and protect them.
Smoke extraction ducts will protect the premises through which a fire is passed throughout its path, while ventilation ducts will protect the interior volume of a duct from a fire, the usual expression for an “external fire”.
Learn more about passive fire protection. (Link)
GEOTEC® smoke extraction ducts and ventilation ducts
GEOTEC® Smoke and heat extraction ducts are made by juxtaposing 1000 mm long GEOTEC®S fire resistant boards of 30- or 45-mm thickness. These systems are available for fire ratings from EI 60 to EI 120: 1 to 2 hours fire resistance, according to EN 13501-3 and EN 13501-4.
All fire-resistant plates are moulded to standard dimensions with a rebate on all four sides for 45mm thick ducts and on two sides for 30mm thick ducts to facilitate assembly.
GEOTEC® fire ducts can also be made using GEOTEC®SX fire resistant sheets of 1000mm length and 1200mm width for 30mm or 45mm thicknesses. These single size sheets have no longitudinal rabbets for easy cutting and assembly.
System advantages
- Assembly by screwing, stapling and using the “polochonnage” solution (mixture of sisal fibre and adhesive) possible
- Light-weight materials
- 100% natural gypsum-based products
- CE certified
- Ease of installation
- Time saving
- Products compatible with fire dampers and shutters
System performances
GEOTEC® smoke extraction ducts
Tests in accordance with EN 1366-8 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied | Tests in accordance with EN 1366-8 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied |
---|---|---|---|---|---|---|---|
Horizontal and vertical smoke extraction | GEOTEC® S or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n° EFR-16-002205 Rév.1 | 0x0 to 2500x2000 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Polochonnage (mixture of sisal fibre and glue) |
Horizontal and vertical smoke extraction | GEOTEC® or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n°EFR-16-002203 Rév.1 | 0x0 to 2500x1500 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Glue and Screw system |
GEOTEC® ventilation ducts
Tests in accordance with EN 1366-1 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied | Tests in accordance with EN 1366-1 | Board’s reference | Thickness (mm) | Fire resistance classification EI S i <-> o | EFECTIS assessments | Internal cross-sections (mm) | Max ht | System applied |
---|---|---|---|---|---|---|---|
Horizontal and vertical ventilation | GEOTEC® S or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n° EFR-16-002204 Rév.1 | 0x0 to 2500x2000 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Polochonnage (mixture of sisal fibre and glue) |
Horizontal and vertical ventilation | GEOTEC® S or GEOTEC® SX | 30 or 45 | EI 60S or EI 120S | PV n° EFR-16-002202 Rév.1 | 0x0 to 2500x1500 | 7 ml (2 reinforcement collars) 10 ml (3 reinforcement collars) | Glue and Screw system |